Experts in a financial institution spend much of their time preparing decisions, not making them. The analysts, quants and actuaries who answer for a decision give a large part of their week to the work that comes before it.
That work has to be done. The question this article asks is what it costs to do it by hand, because the answer is more than the hours.
The work before the decision
Preparation comes in three kinds, and most teams will recognise all of them.
- Wrangling data. The figures a decision needs sit in several systems. Someone pulls them out, lines them up and turns them into one usable view.
- Assembling evidence. A reviewer will ask where each figure came from and why it was chosen. Someone gathers that material so the question can be answered.
- Producing the first read. Before a discussion can start, someone writes down what the figures seem to say.
None of this is the decision. It is the groundwork that lets a decision be made, reviewed and defended.
The cost you can see
The visible cost is time, and it is the time of the people whose judgement the institution is paying for.
It is rarely counted. Preparation has no budget line of its own. It sits inside the working week of each person who does it, so nobody adds it up, and a cost that nobody adds up is easy to live with.
The costs you cannot see so easily
The hours are only the start. Four other costs follow from doing this work by hand.
Judgement gets what is left. A decision usually has a date. When preparation takes longer, the date does not move, so the time that shrinks is the time for thinking. The part of the work that needs an expert is the part that gets squeezed.
Review gets thinner. A reviewer can only examine what arrives, and it often arrives late. Evidence put together by hand is also hard to check. If the reviewer cannot see what went in and repeat what was done, some of it has to be taken on trust.
The process lives in one person. Manual preparation is learned by doing it. Over time one person knows which system to trust, which file is current and which step cannot be skipped. The team then depends on that person being there.
Every step is a place for a mistake. Each figure that is copied, pasted or retyped can be copied wrongly. Careful people catch most of these. The ones that slip through tend to be found late, by a reviewer or after the decision.
There is one more, quieter than the rest. The work is done again every cycle. Little of last quarter's effort carries over, so the same hours are spent on the same steps the next time.
Why it carries on
If manual preparation costs this much, why does it continue? We think there are three reasons.
Each step is small and sensible. No single task looks like a problem, so none is treated as one.
It works. The pack is produced, the decision is made and the deadline is met. The cost is paid by the people doing the work, in time and attention, and it does not show up as a failure.
Nobody owns it. The process crosses several applications and several people, and each of them owns only their own part. Nobody is asked to look at it from end to end.
What to take away, and what to leave
The answer is not to remove the analyst. It is to remove the preparation from the analyst's desk.
This is where AI is useful. It can gather the material, compare it, look into what seems unusual and draft a first read, with its work laid out for the team to see. That covers a great deal of the wrangling, the assembling and the first draft.
Two things stay where they are. The numbers a decision rests on should come from repeatable calculations, so that the same inputs give the same figures every time. And the decision stays with the people who answer for it. Approvals and review steps remain where the institution's policies put them.
Done this way, review gets easier, not harder. A reviewer can see what data went in, what was calculated and who approved it.
Where to start
Start with one workflow, not with a tool.
Write it down from end to end: the applications it uses, the approvals it needs and the hand-offs between people. Mark the steps that are preparation and the steps that are judgement. Most teams have never seen their own process on one page, and the picture is often enough to show where the time goes.
Then take the preparation out of that one workflow, and run the new way alongside the manual one until the team trusts it.
We would not promise a number for what this saves. What changes is where the week goes: less of it on getting ready to decide, and more of it on the decision.
If one of your team's workflows looks like this, we are glad to talk it through.
